A MaterialOrder represents materials ordered for a Work Order on a project, including its supplier, delivery details, and cost totals. Material orders are read-only through the Material Orders endpoints, which also let you download a material order as a PDF.

Materials ordered for a project's work order.

id
integer

The material order's unique identifier.

Example:

26410

tenant_id
integer

The id of your organization's account.

Example:

12

work_order_id
integer | null

The id of the work order these materials are for. Null if not linked to a work order. See Work Order.

Example:

15840

project_id
integer

The id of the project this material order belongs to.

Example:

9103

trade_id
integer | null

The id of the material order's trade. Null if not set. There's currently no endpoint to list trades.

Example:

12

contract_id
integer

The id of the contract this material order is associated with. See Contract.

Example:

3390

status_id
integer | null

The id of the material order's status, from your organization's configured material order statuses. Null if not set. Embed the status name with include=status.

Example:

2

supplier_id
integer | null

The id of the supplier this material order was placed with. Null if not set. See List suppliers.

Example:

88

delivery_time_id
integer | null

The id of the requested delivery time slot. Null if not set. There's currently no endpoint to list delivery times.

Example:

3

delivery_place_id
integer | null

The id of the requested delivery location. Null if not set. There's currently no endpoint to list delivery places.

Example:

1

type_id
integer | null

The id of the material order's type. Null if not set. There's currently no endpoint to list material order types.

Example:

4

description
string | null

A description of the materials ordered. Null if not set.

Example:

"30 squares of architectural shingles, underlayment, and flashing."

delivery_comment
string | null

Notes about the delivery. Null if not set.

Example:

"Deliver to the driveway before 9am."

cost_comment
string | null

Notes about the cost of this material order. Null if not set.

reference_number
string | null

The purchase order or reference number for this material order. Null if not set.

Example:

"PO-55210"

instructions
string | null

Instructions for fulfilling this material order. Null if not set.

Example:

"Stage materials near the garage."

cost_status
enum<integer>

The material order's cost status. 1 = pending, 2 = approved, 3 = paid.

Available options:
1,
2,
3
Example:

2

readable_cost_status
string

The display name for cost_status: Pending, Approved, or Paid.

Example:

"Approved"

cost_type
enum<integer>

The material order's cost type. 0 = event, 1 = supplier.

Available options:
0,
1
Example:

1

readable_cost_type
string

The display name for cost_type — Event or Supplier.

Example:

"Supplier"

estimate_cost_amount
string

The estimated cost of this material order, formatted as a decimal string.

Example:

"1800.00"

actual_cost_amount
string

The actual cost of this material order, formatted as a decimal string.

Example:

"0.00"

submitted_at
string<date> | null

The date this material order was submitted. Null if not yet submitted.

Example:

"2025-02-18"

back_ordered_at
string<date> | null

The date this material order was back-ordered. Null if not back-ordered.

delivery_at
string<date> | null

The date this material order was or will be delivered. Null if not set.

Example:

"2025-03-01"

created_at
string

Timestamp when the material order was created, formatted as YYYY-MM-DD HH:MM:SS.

Example:

"2025-02-18 10:00:00"